Baloe assisting on Dolwin 3 project

This year our Baloe will be once again assisting the BoDo Installer. For the 4th consecutive year, Herman Senior is already working with this small but very efficient cable layer. This time they are at work on the Dolwin 3 project, which takes place on the Ems between the Netherlands and Germany, and consists of laying a power cable to the offshore. The works of the Baloe are mainly towing, anchor handling and supplying of BoDo Installer.

» Tag your friend on facebook with an @ to share this post with him.